Name of the Project
Double-shaft lime kiln with 650 ton/day capacity
Project Details
- Complete design, manufacturing and installation of a double-shaft lime kiln with 650 ton/day capacity
- Design, manufacturing and installation of an open limestone stokehole with 20,000 ton capacity
- Manufacturing and installation of a limestone storage, dispatch and sifting facility with 200 ton/h capacity
- Manufacturing and installation of a lime crushing, sifting and dispatch system with 100 ton/h capacity
- Complete electrical - automation works of the plant
Principal
Nuh Yapı Ürünleri A.Ş.
Location
Kocaeli