Name of the Project

Complete manufacturing and installation of a double-shaft lime kiln with 400 ton/day capacity

Project Details

  • Complete manufacturing and installation of a double-shaft lime kiln with 400 ton/day capacity
  • Manufacturing and installation of a coal grinding plant with 5 ton/hour capacity
  • Manufacturing and installation of a limestone storage, sifting and dispatch plant with 200 ton/h capacity
  • Manufacturing and installation of a lime crushing, sifting, storage and dispatch system with 100 ton/h capacity
  • Complete electrical-automation works of the plant

Principal

İçdaş Çelik Enerji Tersane ve Ulaşım San. A.Ş.

Location

Çanakkale Biga