Name of the Project
Manufacturing and installing a lime kiln and Stone-Coke feeding unit 500 m3 (250 ton CaO/day capacity)
Project Details
- Manufacturing and installing a lime kiln and Stone-Coke feeding unit 500 m3 (250 ton CaO/day capacity)
- Manufacturing and intallation of a Lime Milk Preparation Unit at Bogazliyan Sugar Factory
- Manufacturing and installation of a Sugar Beet Washing Trommel ( Ø 4000 mm x 15,000 mm) at Bogazliyan Sugar Factory
- Manufacturing and intallation of 3 weed catchers at Bogazliyan Sugar Factory
- Entire installation works of the Bogazliyan Sugar Factory Washing Facility
Principal
OEP
Location
Kayseri